top of page
Hangar.jpg

DLA DISTRIBUTION COMPLEX

- Robins Air Force Base, GA -

US_Army_Corps.png

PROJECT CLIENT

U.S. Army Corps of Engineers

PROJECT VALUE

$7,133,100

PROJECT SIZE

105,000 sq. ft.

PROJECT COMPLETION

March 2017

PROJECT DESCRIPTION

As the prime contractor, IAP Design Build oversaw various renovations, demolition, and hazardous material abatement in ten buildings at Robins Air Force Base. The existing battalion headquarters was also expanded during the project. TA 50 wash buildings and organizational storage buildings were constructed within the complex.

All hazardous materials were abated under proper supervision and in accordance with USACE EM3651-1 Manual. 

Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features were included to create a more environmentally conscious facility. 

SELF-PERFORMED WORK

Prime Contractor, On-Site Staff, Quality Control, Safety, Contract Management, Deliverables, Environmental Protection, Scheduling, Roofing, & Prefabricated Building Installation

SCOPE OF WORK

  • Electrical Upgrades

  • Sustainable Mechanical Features Upgrades

  • Sprinkler & Life Safety Upgrades

  • Roofing

  • Water, Sewer, & Natural Gas Services

  • Security Lighting

  • Exterior Communications

  • Fire Protection

  • Site Preparation

  • Paving, Striping, Curb, Gutter, & Sidewalks

  • Landscaping

  • Erosion Control & Grassing

  • Hazardous Material Abatement (Asbestos & Lead Paint)

  • Demolition

  • New Construction

  • Prefabricated Building Installation