SCIF RENOVATION
Georgia Center for Language (GCL) Building 21720
- Fort Gordon, GA -
PROJECT DESCRIPTION
As the design-bid-builder, IAP Design Build, LLC was originally contracted to renovate the Georgia Center for Language (GCL) Building 21720 to convert the space into new administrative areas, classrooms, open storage, SCIF area, and multipurpose/conference areas. New building systems would be replaced and the interior renovated into the aforementioned areas.
Once the project began, Mod 4 changed the design of the building to be an entire SCIF building, thereby eliminating windows and requiring additional security and on-site guards for the duration of the project. The exterior of the facility was completely removed and replaced with masonry to provide additional security and deter threats.
2018 QUARTERLY SAFETY AWARD WINNER

Due to the sensitive nature of SCIF projects, no photos of the completed building are available.
SCOPE OF WORK
Replacement, Removal, and Renovation:
-
Roofing
-
Interior and Exterior Walls
-
Exterior Doors
-
Windows
-
Interior Finishes
-
Finished Floors
-
Ceilings
-
Plumbing
-
HVAC Controls
-
Electrical Systems
-
Communication System
-
CIPR
-
NIPR
-
Fire Detection, Alarm, and Suppression Systems
-
Building Information Systems
​
SELF-PERFORMED WORK
-
Prime Contractor
-
Contract Management & Supervision
-
Quality Control
-
Demolition
-
Roofing
-
Electrical Installation
-
Security
-
HVAC and Mechanical Works
-
Deliverables
-
Environmental Protection
-
Scheduling
-
SCIF Management Services
OTHER WORK COMPLETED
-
Demolition
-
Hazardous Material Abatement
-
Erosion and Sedimentation Control
-
Utilities
-
Walkways