top of page
100_0394.JPG

PAAF HANGAR 722

- Fort Bragg, NC -

US_Army_Corps.png

PROJECT CLIENT

U.S. Army Corps of Engineers

PROJECT VALUE

$724,000

PROJECT SIZE

4,300 sq. ft.

PROJECT COMPLETION

May 2016

PROJECT DESCRIPTION

IAP Design Build designed and fully renovated the existing office space and mezzanine of the aircraft hangar building #722. In addition to the interior renovation, the project called for the repair of the building envelope and roofing system in order to obtain a waterproof and air tight facility. Therefore, the exterior walls were stripped, sealed, and rebuilt. Upon repairing the exterior walls, mold was uncovered and required mitigation.

SCOPE OF WORK

  • Demolition of All Interior Partitions

  • Removal of Equipment

  • Re-layout and Rebuild Partitions

  • Roofing Replacement

  • Exterior Wall Repair

  • Mold Mitigation

Fort%20Bragg%20Hangar_edited.jpg
100_0394.JPG

SELF-PERFORMED WORK

Prime Contractor, On-Site Staff, Quality Control, Safety, Contract Management, Deliverables, Environmental Protection, & Scheduling

IAP Design Build LLC Logo
bottom of page