top of page
PAAF HANGAR 722
- Fort Bragg, NC -
PROJECT DESCRIPTION
IAP Design Build designed and fully renovated the existing office space and mezzanine of the aircraft hangar building #722. In addition to the interior renovation, the project called for the repair of the building envelope and roofing system in order to obtain a waterproof and air tight facility. Therefore, the exterior walls were stripped, sealed, and rebuilt. Upon repairing the exterior walls, mold was uncovered and required mitigation.
SCOPE OF WORK
-
Demolition of All Interior Partitions
-
Removal of Equipment
-
Re-layout and Rebuild Partitions
-
Roofing Replacement
-
Exterior Wall Repair
-
Mold Mitigation
SELF-PERFORMED WORK
Prime Contractor, On-Site Staff, Quality Control, Safety, Contract Management, Deliverables, Environmental Protection, & Scheduling
bottom of page